At about 8:30 this morning, a group of 17 from San Lucas Toliman, a village around the lake from us, arrived to work here at the Camp. The above picture may not look like much, but 6 or 7 truckloads of dirt were moved from across the highway to fill in behind the new wall by one group. They also moved the small trees that had originally been planted on the left of the wall to the right. Another group dug a 25 foot trench and a 7 foot deep hole, which will all be part of the septic system for the bathrooms. All in all, a good morning's work. I know that Johnny is pooped!
No comments:
Post a Comment